« Energy Metals Reports Significant Drilling Results at La Palangana; Hobson Plant Refurbishment and Permitting on Schedule at Texas Operations (CCNMatthews) | Home | Purepoint Uranium Group Inc: Appoints Chief Geophysicist, Roger Watson (Market Wire) »
Drilling To Commence On New Zone At Cluff Lake Project - Athabasca Basin (CNW Group)
By bruce.greer | October 30, 2006
ESO Uranium Corp. announces that it has completed an extensive ground exploration program on its Cluff Lake Project, Western Athabasca Basin, Saskatchewan which included over 150 line km of horizontal loop EM, 31 km of resistivity surveys, boulder sampling and prospecting.
Original post by Clean Energy and software by Elliott Back
Topics: Uncategorized |